BESCOM New Connection and BWSSB New Connection for a House
How to apply for a BESCOM new connection and a BWSSB new connection for a new house in Bengaluru: process, typical documents, charges and common delays.
By the Homes in Bangalore editorial teamLast reviewed 5 min read1,093 words

Short answer
For a new house in Bengaluru, you apply for a BESCOM new connection for electricity and a BWSSB new connection for water supply and sewerage, usually online through each utility's official channels. Typical documents include ownership proof, the khata, the sanctioned building plan, the occupancy certificate or an applicable exemption, and work completion details from a licensed electrical contractor or plumber. Charges and deposits depend on the load, plot and building size (verify current requirements).
Key takeaways
- ◆A BESCOM new connection and a BWSSB water and sewerage connection are separate applications, each with its own documents and charges.
- ◆For construction, arrange temporary power first, then apply for a permanent connection once the building is complete (verify current requirements).
- ◆Both utilities have generally asked for ownership proof, a sanctioned plan and an occupancy certificate or applicable exemption for permanent connections (verify current requirements).
- ◆Apply through official channels, keep every receipt and use licensed electrical contractors and plumbers for the work.
Temporary and permanent connections
Construction needs power and water before the house exists. BESCOM (opens official website) generally offers a temporary connection for construction, billed under a temporary supply tariff, which is replaced by a permanent connection after completion (verify current requirements). For water during construction, many owners rely on a borewell or tankers, because a permanent BWSSB (opens official website) connection usually follows completion.
Plan the permanent connections early. Decide the load with your electrical consultant, fix the meter location and service cable route, and plan the water and sewer line routes, sump and rainwater harvesting with your architect, so that inspections go smoothly.
How to apply for a BESCOM new connection
Bangalore Electricity Supply Company (BESCOM) distributes electricity in Bengaluru and surrounding districts. A new connection is generally applied for online, and the steps typically include registering, submitting the application with documents, paying the prescribed charges, an inspection of the installation and meter fixing. Typical documents are listed below (verify current requirements).
- Ownership proof, such as the sale deed, with the khata or e-Swathu record
- Identity proof of the applicant
- Sanctioned building plan
- Occupancy certificate, or proof that the building falls under an exemption
- Wiring completion and test report from a licensed electrical contractor
- Details of the load required, with any equipment needed for larger loads
How to apply for a BWSSB new connection
The Bangalore Water Supply and Sewerage Board (BWSSB) provides piped water and sewerage within its service area. A new connection application, typically made online, can cover water supply, sewerage or both. BWSSB may levy one-time charges, deposits and other fees depending on plot and building size, and it checks rainwater harvesting compliance (verify current requirements). Typical documents include:
- Ownership proof and khata record
- Latest property tax paid receipt
- Sanctioned building plan
- Occupancy certificate, or proof of an applicable exemption
- Rainwater harvesting details, where required
- Details of the licensed plumber doing the connection work
BESCOM and BWSSB connections compared
The two applications run in parallel but differ in timing, documents and coverage. If your plot is outside BWSSB's network, for example in a gram panchayat area, water and sewerage may come from the local body or may not be available, so plan for a borewell, sump and septic tank or a local sewage arrangement (verify with the local body).
| Point | BESCOM (electricity) | BWSSB (water and sewerage) |
|---|---|---|
| What you get | Electricity supply and meter | Water supply, sewerage or both |
| When to apply | Temporary supply for construction; permanent after completion | Usually after completion |
| Typical documents | Ownership proof, sanctioned plan, OC or exemption, contractor's test report | Ownership proof, tax receipt, sanctioned plan, OC or exemption, rainwater harvesting details |
| Charges | Depend on load and connection type (verify) | Depend on plot and building size and connection type (verify) |
| Who does the work | Licensed electrical contractor | Licensed plumber |
| Area covered | Bengaluru and surrounding districts | BWSSB service area; outside it, check with the local body |
Common reasons for delays
Most delays come from documents rather than the network. If an application is returned, fix the specific issue named and resubmit rather than starting over, and avoid intermediaries who promise faster connections for unofficial fees.
- Name, address or property ID mismatched across documents
- No occupancy certificate and no clear exemption
- Building that differs from the sanctioned plan
- Incomplete wiring test report or plumbing details
- Rainwater harvesting not installed where required
- Unpaid property tax or pending dues on the property
How to get BESCOM and BWSSB connections for a new house
- 1Arrange temporary supplyApply for temporary power for construction and plan a water source for the site.
- 2Plan permanent servicesFix the load, meter location, water and sewer routes and rainwater harvesting with your consultants.
- 3Prepare documentsCollect ownership proof, khata, tax receipts, the sanctioned plan and OC or exemption proof.
- 4Apply onlineSubmit applications through the official BESCOM and BWSSB channels (verify current requirements).
- 5Pay and allow inspectionPay demanded charges through official channels and allow the utility's site inspection.
- 6Get meters connectedConfirm meter installation, check the first bills and keep all receipts.
Frequently asked questions
What documents are required for a BESCOM new connection?+
Typically, ownership proof such as the sale deed and khata, the applicant's identity proof, the sanctioned building plan, an occupancy certificate or proof of an applicable exemption, and a wiring completion and test report from a licensed electrical contractor. Larger loads may need additional technical details. Requirements change, so check the current list on BESCOM's official channels before applying (verify current requirements).
Can I get a BWSSB new connection without an occupancy certificate?+
BWSSB has generally required an occupancy certificate for new connections, and the rules have been revised in recent years with exemptions for some smaller residential buildings. Whether your building qualifies depends on its size and the current rules, so check with BWSSB before applying, and do not assume a building without an OC will be connected (verify current requirements).
How long does a BESCOM new connection take?+
There is no fixed timeline we can quote. It depends on whether documents are complete, the load required, whether network work such as a new transformer or cable is needed, and inspection schedules. Applying online with matching documents and a licensed contractor's test report avoids the most common delays. Track the application through BESCOM's official channels (verify current requirements).
What if my plot is outside the BWSSB area?+
If the property lies outside BWSSB's service area, for example in a gram panchayat, water and sewerage may be provided by the local body, or not at all. Many owners rely on a borewell, sump, septic tank or a local sewage system. Check what is available with the local body before buying, and budget for these arrangements (verify with the local body).